ENRU

Distribution Transformers and Switchgear for Uzbekistan

Talk to us directly WhatsApp +86 137 5500 7509 Send your specifications

Uzbekistan's electricity sector is overseen by the Ministry of Energy, and our transformers for the market are built to the GOST interstate standards. Our own factory in China manufactures oil-immersed and dry-type distribution transformers and switchgear, to the ratio and vector group your project specifies.

20–2500 kVA at 10(6) kV 50–20000 kVA at 35 kV 15 days production after drawing approval (up to 630 kVA; 25 days above 630 kVA)
In Short

Uzbekistan's electricity sector is overseen by the Ministry of Energy. The National Electric Grid of Uzbekistan operates the trunk networks, and Regional Electric Networks manage the enterprises that run the territorial grids distributing electricity to end users. Our transformers for Uzbekistan are built to the GOST interstate standards, the CIS design and test basis maintained through the Euro-Asian Council for Standardization, Metrology and Certification; Uzbekistan's national body for technical regulation and metrology is the Uzbek Agency for Technical Regulation. Our own factory in China manufactures oil-immersed and dry-type distribution transformers — 10(6) kV class: oil-immersed 20–2500 kVA, dry-type 30–2500 kVA; 35 kV class: oil-immersed 50–20000 kVA — plus ring main units and low-voltage panels. Every transformer ships with its routine test report. A 200 kVA oil-immersed distribution transformer is USD 2215 EXW, and regular batch orders are produced in about 15 days after the drawing is confirmed.

Who Runs the Network
Specifications

Our standard production range. Every unit is built to the ratio, vector group and capacity you specify:

Voltage class Capacity Standard Typical use
10(6)/0.4 kV 20–2500 kVA GOST Pole- and pad-mounted distribution; commercial and light-industrial loads
35 kV class 50–20000 kVA GOST Sub-transmission and distribution substations
Dry-type, 10(6) kV class 30–2500 kVA GOST Indoor and fire-sensitive sites
RMU and LV panel, up to 35 kV on request GOST design practice Transformer MV/LV interface and ring mains

Project-specific type-test documentation is not part of our standard scope. Tell us at enquiry stage if your project requires it.

Price and Lead Time
Published reference price
200 kVA oil-immersed distribution transformer = USD 2215 EXW
Other ratings are quoted against your specification. Send the ratio, capacity and destination and we will price it.
Experience

2026 — Uzbekistan: 3 × 500 kVA, 10 kV class oil-immersed distribution transformers, delivered and commissioned.

Common Questions
Which standards apply to transformers for Uzbekistan?
Transformers for Uzbekistan are built to GOST, the interstate standard system used across the CIS. Tell us the ratio, vector group and capacity your project specifies, and we confirm the design before production starts.
What are the payment terms and the lead time?
Regular batch orders are produced in about 15 days after the drawing is confirmed (up to 630 kVA; about 25 days above 630 kVA). The minimum order is one unit. Terms are 30% advance and 70% before shipment, with a one-year warranty starting 30 days after the shipment date. The specific warranty terms are set out in the contract.
Can switchgear be supplied with the same order?
Yes. Ring main units and low-voltage panels, up to 35 kV, can be quoted and shipped with your transformer order so that freight is consolidated.

Send us the specification

Voltage ratio, vector group, capacity and destination. With those four we can come back with a specification-matched price and the documents that apply to your order.

Related pages

Detailed specifications, drawings or datasheets: email [email protected]. Quality and Testing · Factory · Transformers and Switchgear

We use essential cookies to keep this site running, and — with your consent — Google Analytics cookies to understand how the site is used. View full privacy policy
Cookie settings