ENFRDERUES

Quality, Testing and Certification

What our affiliated transformer factory is certified to, what is measured on every unit before it ships, and what we can show you before you order.

ISO 9001 / 14001 / 45001 management systems Routine test report with every unit Built to IEC/GB design standards
In Short
Routine transformer testing before shipment

What we can prove about the units we ship

DailyENS is the export arm of an affiliated transformer factory in China, and this page sets out what that factory can show a buyer. Its management systems are certified to ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (occupational health and safety), and its transformers and switchgear are manufactured to the applicable IEC/GB design and manufacturing standards. Every unit leaves the factory with a routine test report covering the applicable tests: winding resistance, voltage ratio and vector group, short-circuit impedance and load loss, no-load loss and no-load current, insulation resistance, and dielectric withstand tests. Buyers who cannot travel can request a live video walkthrough and video of the testing, or appoint an independent inspection agency with the scope and cost agreed in advance. Certificate copies are supplied to the buyer at the contract stage; numbers, issuing bodies and dates are not published on this website.

Certification
Testing Before Shipment

What the routine test report covers

Every transformer ships with its factory routine test report. The tests below are the applicable routine tests for the unit ordered — the exact set depends on the type, the rating and any special requirements you specify.

Routine testWhat it confirms before the unit ships
Winding resistanceConfirms winding continuity and balance between phases across the tappings.
Voltage ratio and vector groupConfirms the unit delivers the ratio and phase displacement you ordered, on every tap.
Short-circuit impedance and load lossThe impedance your protection settings depend on, and the copper losses used for loss evaluation.
No-load loss and no-load currentThe core losses and magnetising current — the base of your no-load running cost.
Insulation resistanceFlags moisture, contamination or insulation damage before the unit is packed.
Dielectric (withstand voltage) testsApplied-voltage and induced-voltage testing of the insulation system.

The report travels with the shipment as standard. Project-specific type tests and witnessed testing are a separate matter — raise them at enquiry stage and we will tell you straight away whether your requirement is one we can meet.

Verification When You Can't Visit
Common Questions
Is the factory certified?
Yes. Our affiliated factory operates management systems certified to ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (occupational health and safety). We publish the conclusion on this page; the certificate copies, with their numbers and issuing details, are supplied to the buyer at the contract stage.
Can I see the test report before I place the order?
The routine test report is issued for your specific unit and travels with the shipment. What it covers is listed above, and the same routine test set applies to every unit in a given order.
Do you provide type-test certificates or witnessed testing?
Not as standard. Units are built to IEC/GB design practice, and the routine test report is what accompanies each unit. If your project requires full, project-specific type-test documentation or witnessed certification, tell us at enquiry stage — that is a requirement we cannot currently meet.
Can someone inspect the goods on my behalf?
Yes — you can appoint an independent inspection agency. The standard they work to and the cost are agreed before anything is booked, and the inspection happens before the container is loaded.
Can I see the factory without travelling to China?
Yes. We can arrange a live video walkthrough of the factory, share production progress videos for your order, and provide video of the test and inspection process before shipment.
Does this page cover solar and storage orders as well?
No — this page covers the transformer and switchgear line, which our affiliated factory manufactures. Solar and storage equipment is sourced from verified Chinese manufacturers, and the Solar & Storage page explains how those orders are selected, inspected and documented.

Questions about certification or testing for your project?

Send the voltage class, the capacity and the destination. We will answer with the documents that apply to your order, and what we can share at each stage.

Email the specification or the certificate question to [email protected]. See the production floor and the test bench on the factory page, and every contact route on the contact page.

We use essential cookies to keep this site running, and — with your consent — Google Analytics cookies to understand how the site is used. View full privacy policy
Cookie settings