What our affiliated transformer factory is certified to, what is measured on every unit before it ships, and what we can show you before you order.
DailyENS is the export arm of an affiliated transformer factory in China, and this page sets out what that factory can show a buyer. Its management systems are certified to ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (occupational health and safety), and its transformers and switchgear are manufactured to the applicable IEC/GB design and manufacturing standards. Every unit leaves the factory with a routine test report covering the applicable tests: winding resistance, voltage ratio and vector group, short-circuit impedance and load loss, no-load loss and no-load current, insulation resistance, and dielectric withstand tests. Buyers who cannot travel can request a live video walkthrough and video of the testing, or appoint an independent inspection agency with the scope and cost agreed in advance. Certificate copies are supplied to the buyer at the contract stage; numbers, issuing bodies and dates are not published on this website.
Our affiliated factory operates management systems certified to ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (occupational health and safety).
Our transformers and switchgear are manufactured to applicable IEC/GB design and manufacturing standards.
Certificate numbers, issuing bodies and validity dates are treated as company information and are not published on this website. Copies of the certificates and of the factory's business licence are supplied to the buyer at the contract stage.
Every transformer ships with its factory routine test report. The tests below are the applicable routine tests for the unit ordered — the exact set depends on the type, the rating and any special requirements you specify.
| Routine test | What it confirms before the unit ships |
|---|---|
| Winding resistance | Confirms winding continuity and balance between phases across the tappings. |
| Voltage ratio and vector group | Confirms the unit delivers the ratio and phase displacement you ordered, on every tap. |
| Short-circuit impedance and load loss | The impedance your protection settings depend on, and the copper losses used for loss evaluation. |
| No-load loss and no-load current | The core losses and magnetising current — the base of your no-load running cost. |
| Insulation resistance | Flags moisture, contamination or insulation damage before the unit is packed. |
| Dielectric (withstand voltage) tests | Applied-voltage and induced-voltage testing of the insulation system. |
The report travels with the shipment as standard. Project-specific type tests and witnessed testing are a separate matter — raise them at enquiry stage and we will tell you straight away whether your requirement is one we can meet.
Can't travel to China? Ask for a live video walkthrough of the production floor, or a video of your own unit being routine-tested before it is packed.
You can appoint an independent inspection agency. The standard they work to and the cost are agreed before anything is booked, and the inspection happens before the container is loaded.
Orders, documents and claims all run through DailyENS. If an issue starts at the factory, resolving it is still our job, not yours.
Send the voltage class, the capacity and the destination. We will answer with the documents that apply to your order, and what we can share at each stage.
Email the specification or the certificate question to [email protected]. See the production floor and the test bench on the factory page, and every contact route on the contact page.
Last updated: September 22, 2026
When you use our quote tools or contact us we collect the details you give us — name, email, phone/WhatsApp, country/city, your electricity usage and price, company name and any business licence/registration number you choose to provide, plus the content of your messages. When you browse we automatically collect page views, events, device/browser information, an approximate (city-level) location derived from your IP address, and — only with your consent — a pseudonymous analytics identifier stored in a cookie. Read the full privacy policy for the complete list and the purposes.
To prepare quotes, answer enquiries, follow up on orders and installation, improve the website, and meet our legal obligations. We never sell your personal information. Full details.
Essential cookies are needed to run the site. Analytics cookies are only set after you choose Accept all — if you choose Essential only (or close this banner) no analytics cookie is written.
| Cookie | Category | Purpose | Duration | Consent required |
|---|---|---|---|---|
_ga |
Analytics | Tells one visitor apart from another for aggregate traffic statistics. | 2 years by default | Yes |
_ga_JRCS1TC26Y |
Analytics | Keeps the session/visit state for this GA4 property. | 2 years by default | Yes |
We use Google Analytics 4 to measure visits and understand which pages are useful. Google acts as a data processor for us. Your IP address is transmitted to Google so it can derive an approximate location, but GA4 standard properties do not log or store IP addresses. Google signals are not enabled. Event-level data is kept for 14 months in our GA4 property. If you decline analytics cookies, the analytics cookie is not written and analytics storage stays denied.
You can access, correct or delete your personal information, restrict or object to processing, request portability, withdraw consent at any time, and lodge a complaint with your supervisory authority. Contact [email protected]. Full details.
Use Cookie settings (in this banner, at the bottom of every page, or on the privacy policy page) to change your selection — it takes effect immediately.